Ground Up Development Finance

Ground up development finance explained: staged funding from a cleared site, residential up to 75% LTGDV and 90% LTC, commercial usually 65% to 70% LTGDV on the cases we arrange, and the drawdown arithmetic.

Expert advice on Ground Up Development Finance

Speak to a Mortgage Lane adviser about your options.

Get a free quoteWhatsApp us

In short

Ground up development finance is short-term funding for a scheme built from a cleared or vacant site, from the foundations upwards, released in stages against the monitoring surveyor's certificates and repaid from the sale or refinance of the finished buildings.

What is ground up development finance?

Ground up development finance is short-term funding for a scheme built from a cleared or vacant site, from the foundations upwards, released in stages against the monitoring surveyor's certificates and repaid from the sale or refinance of the finished buildings. It is the most fully staged form of development finance: a land advance on day one, then drawdowns that follow the build programme through groundworks, superstructure, first fix and second fix to completion. Interest is usually rolled up into the facility rather than paid monthly, and the facility is sized against both the finished scheme's gross development value (GDV) and its total cost.

Lending to a company or investor for a ground-up scheme is unregulated business finance. A new home the borrower will live in is regulated self-build lending under the Financial Conduct Authority's MCOB rules, covered on self-build mortgage lenders. New building is still the main source of new homes: England added 190,600 new-build dwellings in 2024 to 2025, out of 208,600 net additional dwellings (MHCLG accredited official statistics).

Ground up development finance rates

Ground up development finance is priced through interest and fees. Interest is charged on the drawn balance and rolled up or retained. The fees are an arrangement fee on the facility, an exit fee on the loan or the GDV, monitoring surveyor fees for each drawdown inspection, and valuation and legal fees. Ground-up schemes carry more cost risk than conversions, so the contingency, the contractor's strength and the developer's experience all move the price, alongside leverage, scheme type and location. The full cost structure is on the property development finance page.

As at 1 October 2026, the lowest development finance rate we were seeing was 0.45% a month, for the strongest schemes. Riskier schemes price above that, because pricing rises with leverage, scheme risk and the developer's experience. Every rate is subject to status and lender criteria and can change.

If you have a consented site and a build tender, get in touch. We run both caps against the scheme, check the drawdown schedule against the programme and tell you what the scheme supports before any lender is approached.

Ground up development finance criteria

The figures below are the positions we see on the cases we arrange, as at 1 October 2026. They describe our experience across the lenders we use and are not a rule for the whole market. Each lender sets its own criteria, and the terms on any scheme depend on the scheme, the borrower and the lender's own assessment.

Ground up development finance criteria

Ground up development finance criteria
CriterionValue
Residential ground up: maximum leverageUp to 75% loan to gross development value (LTGDV) and 90% loan to cost (LTC) on the cases we arrange. The facility is the lower of the two
Commercial ground up: maximum leverageUp to 70% LTGDV and 90% LTC, deal dependent; pure commercial ground-up schemes are usually nearer 65% LTGDV
HMO-led schemesUp to 75% LTGDV on the cases we arrange
Hotel and student schemesSpecialist lending, usually up to 65% LTGDV in our experience
High-street bank lendingUsually up to 50% LTGDV in our experience, generally for experienced developers with strong balance sheets
Day-one land advanceAround 70% of the land value with specialist lenders and around 40% on the high street, in our experience
Build drawdownsReleased in arrears against the monitoring surveyor's certificates, following the programme from groundworks to completion; interest rolled up
PlanningFull planning permission, or outline permission with reserved matters approved; pre-commencement conditions discharged before the first build drawdown
Build contractA fixed-price or tendered contract with a contractor the lender accepts, a programme with float and a contingency inside the cost plan
WarrantyA structural warranty (NHBC, LABC or an equivalent provider) or a Professional Consultant Certificate arranged from the outset
Building safetyBuildings at least 18 metres high or with at least seven storeys and at least two residential units are higher-risk buildings under the Building Safety Act 2022 and need Building Safety Regulator approval before work starts
Profit on costCommonly 15% to 20% required, tested on the valuer's GDV rather than the developer's
TermUp to 36 months on the cases we arrange, covering the build period and a sales or refinance period
Minimum and maximum loanMinimum loan around £50,000; no set maximum on the cases we arrange
SecurityFirst charge over the site; debenture over the SPV; assignment of the building contract
Personal guaranteesVary by lender: some take none, others around 25% to 50% of the loan. In our experience they are usually required unless the LTGDV is under 50% and the loan is £1m or more, and the level is often negotiable
Lowest rateFrom 0.45% a month as at 1 October 2026, for the strongest schemes; subject to status and lender criteria
ExitSale of units; refinance onto buy to let, HMO or commercial mortgages; development exit loan

Ground-up schemes, and how each is funded

Ground-up schemes are funded on the ceilings of their end use, so the first question a lender asks is what the finished building will be.

Ground-up housing

New-build houses on a cleared, brownfield or greenfield site, from a single plot to a multi-unit estate, attract the full residential ceilings: up to 75% LTGDV and 90% LTC on the cases we arrange. Lenders underwrite the consented drawings, a tendered or fixed-price build contract, the programme, the contingency, the developer's and contractor's track record, the warranty provider's registration of the plots and the sales evidence for the finished houses. The for-sale and develop-to-let exits are covered on residential development finance.

Ground-up apartment blocks

A new block of flats adds three things to the housing underwrite: the title structure (leasehold flats off a freehold, with a peppercorn ground rent on most new long residential leases granted since 30 June 2022), the building's height and fire-safety position, and how concentrated the exit market is. A block at least 18 metres high or with at least seven storeys, containing at least two residential units, is a higher-risk building under the Building Safety Act 2022. It needs building control approval from the Building Safety Regulator before construction starts and a completion certificate before occupation. These stages, still often called the Building Safety Regulator gateway approvals, sit on the critical path the lender funds against. The multi-unit exit is covered on MUFB mortgages.

Ground-up HMO and co-living

A purpose-built House in Multiple Occupation (HMO) or shared-living scheme is funded up to 75% LTGDV on the cases we arrange, with the exit underwritten on the HMO valuation route, the licensing position and the planning use. The exit is covered in our HMO mortgages guide.

Ground-up commercial

New-build industrial and logistics units, trade counters, offices, retail and healthcare premises are funded on the commercial ceilings: up to 70% LTGDV and 90% LTC on the cases we arrange, deal dependent, with pure commercial ground-up schemes usually nearer 65% LTGDV. The GDV is an investment valuation of the rent the finished building will earn, so a pre-let or forward sale decides how much the scheme can borrow. In our experience a speculative scheme takes the same LTGDV percentage, but on a softer valuation. The commercial exit is worked on commercial property development finance.

Ground-up mixed use

Shops or a surgery on the ground floor with flats above are appraised on a blended GDV and funded between the residential and commercial ceilings according to the split. The exit usually lands on semi-commercial mortgages for the whole building, or on separate residential and commercial refinances where the titles are split.

Ground-up hotels and student accommodation

Hotels and purpose-built student accommodation are valued on trading or rental income rather than sales, and are specialist lending: on the cases we arrange, specialist lenders fund both up to 65% LTGDV. See hotel development finance and PBSA finance.

Single plots and small sites

A single plot, an infill site or a scheme of a handful of units is funded on the same ceilings as a larger scheme, by lenders whose minimum loan suits the scale; on the cases we arrange, facilities start from around £50,000. Small-site lenders weigh the developer's own involvement, a fixed-price contract with a credible builder and a simple exit. First-time developers are covered on development finance for first-time developers.

Land without planning

A site without a buildable consent is funded with a land or bridging loan against its current value, at lower leverage, and the exit is planning consent followed by development finance. See land bridging loans.

The documents we ask for first depend on the end use: the consented drawings and the build tender for housing; the unit schedule, the height and the intended sales mix for a block; the licensing and planning position for an HMO; the pre-let or the letting evidence for a commercial scheme; the unit schedule and the intended title structure for mixed use; and the operator's business plan for a hotel or student scheme. For land, with or without planning, talk to us before buying.

On a ground-up commercial scheme the GDV values the rent the finished building will earn, which makes a pre-let or forward sale the deciding factor in the loan; in our experience a speculative scheme gets the same LTGDV percentage of a softer valuation.

How ground up development finance is arranged

  1. We appraise the scheme against both caps for its end use, set the drawdown schedule against the build programme, define the exit (sale, refinance or retention) and obtain indicative terms from lenders whose criteria match.
  2. The lender instructs a development valuation (current site value, GDV and a build cost review) and the monitoring surveyor's initial report on the cost plan, contract and programme. Its solicitors review the title, the planning consent and its conditions, and the Section 106 and Community Infrastructure Levy obligations, check the warranty registration and complete the security documents.
  3. The day-one land advance funds part of the site purchase. Build costs are then drawn in arrears against the monitoring surveyor's certificates, stage by stage, with interest rolled up.
  4. At practical completion the warranty and building control sign-off are issued, and the units are sold or refinanced, or a development exit loan takes over where sales run beyond the term.

The ground-up arithmetic

A ground-up facility is the lower of two caps, drawn in stages, with the developer's money going in first, and the developer can run each of those calculations before instructing anyone.

Step 1. The two caps by end use

One illustrative site is built three ways, each with a £2,400,000 gross development value and £1,900,000 of total cost (land £500,000, build £1,150,000, and fees, contingency and finance £250,000).

Illustrative arithmetic on hypothetical figures, using the ceilings we see on the cases we arrange. Not an offer of finance.

The ground-up arithmetic

The ground-up arithmetic
ItemHousing schemeCommercial at 70% LTGDVPure commercial at 65% LTGDV
GDV£2,400,000£2,400,000£2,400,000
Total cost£1,900,000£1,900,000£1,900,000
LTGDV cap75% → £1,800,00070% → £1,680,00065% → £1,560,000
LTC cap (90%)£1,710,000£1,710,000£1,710,000
Facility (the lower)£1,710,000, LTC binds£1,680,000, LTGDV binds£1,560,000, LTGDV binds
Developer equity£190,000£220,000£340,000
Profit£500,000£500,000£500,000
Profit on cost26.3%26.3%26.3%

On the housing scheme the cost cap binds and the developer funds 10% of cost. On the commercial versions the value cap binds first, so on the same profit the lender carries less of the cost and the developer's equity rises from £190,000 to £220,000 at 70% LTGDV and to £340,000 at 65%.

Step 2. How the facility is drawn

The table below takes the housing scheme, with illustrative stage costs and a specialist lender's day-one land advance of 70% of the land value.

Step 2 figures

Step 2: how the facility is drawn
StageAmountFunded by
Land purchase (£500,000)£350,000Lender day-one land advance (70% of land value)
Land purchase balance£150,000Developer equity
Groundworks (15% of build)£172,500Build drawdown
Superstructure (35% of build)£402,500Build drawdown
First fix (20% of build)£230,000Build drawdown
Second fix (20% of build)£230,000Build drawdown
Completion (10% of build)£115,000Build drawdown
Fees, contingency and finance (£250,000)£210,000Inside the facility, including rolled-up interest
Fees, contingency and finance balance£40,000Developer equity
Total£1,900,000Lender £1,710,000; developer £190,000

The developer's £190,000 goes in first: the £150,000 balance of the land price and £40,000 of the fees. The lender's £1,710,000 then covers the £350,000 land advance, the £1,150,000 of build drawdowns and £210,000 of fees and rolled-up interest inside the facility. Each build tranche is paid in arrears, after the monitoring surveyor certifies the work, so the contractor's payment terms and the developer's working capital have to bridge each stage. On the high street, where in our experience the day-one land advance is nearer 40% of the land value, the lender would advance £200,000 against the land and the developer would fund £300,000 of the price.

Step 3. Contingency and abnormals

Groundworks, drainage, services and ground conditions are where ground-up costs surface once digging starts. That is why lenders expect a contingency inside the cost plan and weigh the contractor's covenant and the developer's experience more heavily than on a conversion. A site investigation, a utilities search and a tendered groundworks package before the appraisal is finalised remove the largest unknowns. If costs run over, the overrun comes out of the developer's equity and profit first, because the facility is capped.

Step 4. Planning, levies and building safety

The lender funds against a consent that can be built: full planning permission, or outline permission with the reserved matters approved, with pre-commencement conditions discharged before the first build drawdown. The Community Infrastructure Levy and Section 106 obligations belong in the appraisal as costs. A higher-risk building needs building control approval from the Building Safety Regulator before construction starts and a completion certificate before occupation, and both sit on the programme.

Step 5. The exit

Lenders underwrite the exit as hard as the build. Houses and flats exit by sale or by refinance onto buy to let mortgages, and commercial buildings by sale or a commercial mortgage on the let asset. Where sales run beyond the term, development exit finance replaces the facility. The exit must repay the facility including rolled-up interest.

What decides the case

The site and the consent are fixed. The developer controls the end use and the exit mix, the build contract and contingency, the site investigations that remove the abnormals, and the choice of a lender whose appetite matches the scheme. Run both caps and the drawdown schedule before the valuation is instructed.

Related reading: the property development finance page covers the lender tiers and the capital stack; residential development finance and commercial property development finance cover each end use in depth.

Development finance calculator

Applies the two caps to a ground-up scheme. The ceilings start at our residential figures; for a commercial end use enter 70, or 65 for a pure commercial ground-up scheme. Starting figures are the page illustration.

Explore your borrowing

Enter your figures in pounds. Your estimate updates as you go.

Indicative maximum loan

-

Enter your figures to see an estimate.

Discuss your options
Indicative estimate only, based on the figures you enter and the ceilings shown. Lenders also assess experience, planning, the build contract and the exit. This is not an offer of finance. Your property may be repossessed if you do not keep up repayments on a loan secured on it.

Frequently asked questions about ground up development finance

What is ground up development finance?

Ground up development finance is short-term funding for a scheme built from a cleared or vacant site, foundations upwards. A land advance is made on day one, then build costs are released in stages against the monitoring surveyor's certificates, and the loan is repaid from the sale or refinance of the finished buildings.

How much can you borrow for a ground-up development?

A ground-up facility is the lower of a percentage of the finished value and a percentage of total cost, set by the end use. On the cases we arrange, residential schemes run up to 75% of gross development value and 90% of cost, and commercial schemes up to 70% and 90%, deal dependent, with pure commercial ground-up schemes usually nearer 65% of gross development value. Each lender sets its own limits.

How is ground up development finance drawn down?

Ground up development finance is drawn in stages: a land advance at purchase, then build tranches following the programme from groundworks through superstructure, first fix, second fix and completion. Each tranche is released in arrears once the lender's monitoring surveyor certifies the work, with interest usually rolled up into the facility.

Does development finance pay for the land on a ground-up scheme?

Development finance usually pays part of the land price on day one, not all of it. In our experience the day-one land advance is around 70% of the land value with specialist lenders and around 40% on the high street, with the developer funding the balance and the early costs before the build drawdowns start.

What planning do I need for ground up development finance?

A lender funds a ground-up build against a consent that can be built: full planning permission, or outline permission with the reserved matters approved. Pre-commencement conditions must be discharged before the first build drawdown, and Section 106 and Community Infrastructure Levy costs belong in the appraisal. Land without planning is funded with a land or bridging loan instead.

Why is ground-up development riskier than a conversion?

Ground-up development carries more cost risk than a conversion because groundworks, drainage, services and ground conditions only reveal themselves once digging starts. Lenders respond by expecting a contingency inside the cost plan, a credible contractor on a fixed-price or tendered contract, and site investigations before the appraisal is finalised.

What warranty do I need for a new-build development?

A new-build development needs a recognised structural warranty from NHBC, LABC, Premier Guarantee or an equivalent provider, or a Professional Consultant Certificate, arranged and registered from the outset. Development lenders require it, and the sales and refinance exit depends on it, because mortgage lenders on the finished units generally will not lend without one.

Does the Building Safety Act affect ground-up development?

The Building Safety Act 2022 affects a ground-up scheme where the building will be at least 18 metres high or have at least seven storeys and contain at least two residential units, because it is then a higher-risk building. It needs building control approval from the Building Safety Regulator before construction starts and a completion certificate before occupation, and lenders build those timescales into the programme they fund.

What is a monitoring surveyor?

A monitoring surveyor is the chartered surveyor, usually a quantity surveyor, appointed by a development lender to review the cost plan, build contract and programme before the loan, then visit the site and certify the work completed before each drawdown. The borrower usually pays the monitoring surveyor's fees.

What is profit on cost and why do lenders require it?

Profit on cost is a scheme's projected profit divided by its total costs, and lenders commonly require 15% to 20% before funding. The margin absorbs cost overruns, price softening and delays before the lender's security is impaired, which is why thin-profit schemes are declined even at acceptable leverage.

Can a first-time developer get ground up development finance?

A first-time developer can get ground up development finance, usually through stretched senior lenders that fund to the residential ceilings without a track record, or through a joint venture. In place of experience, lenders look for a strong contractor on a fixed-price contract, a monitoring arrangement, a clean consent, an adequate contingency and a simple exit.

How long does a ground-up development facility last?

On the cases we arrange, development facilities run for up to 36 months, covering the build programme and a sales or refinance period. Where units remain unsold at the end of the term, a development exit loan can refinance the facility while the sales complete.

What is the minimum loan for ground up development finance?

On the cases we arrange, development finance starts from around £50,000, with no set maximum. Single plots and small sites are funded on the same ceilings as larger schemes, by lenders whose minimum loan and appetite suit the scale.

What is a personal guarantee?

A personal guarantee is a director's or borrower's commitment to repay personally if the borrowing company cannot. On development finance, guarantees vary by lender: some take none, others a guarantee of around 25% to 50% of the loan. In our experience they are usually required unless the loan is under 50% of gross development value and £1 million or more, and the level is often negotiable.

How are development finance rates calculated?

Development finance rates are charged monthly on the drawn balance rather than the full facility, and are usually rolled up and repaid at exit. The rate sits alongside an arrangement fee, an exit fee, monitoring surveyor fees and valuation and legal costs, and moves with leverage, experience, scheme type and location. As at 1 October 2026, the lowest development finance rate we were seeing was 0.45% a month, for the strongest schemes; rates are subject to status and lender criteria and can change.

What is a development exit loan?

A development exit loan refinances a completed scheme's development facility while units remain unsold, usually at a lower rate, with sales proceeds paying down the loan unit by unit. It gives the developer time to sell before the development lender's term expires. On a hotel or other trading asset it bridges the period until trading supports a term mortgage.

What is the difference between development finance and bridging finance?

Development finance funds building or conversion works in staged drawdowns against certified costs, sized on the finished value and the total cost. Bridging finance is usually a single advance against a property's current value, used for a purchase, light refurbishment or an exit, rather than a facility drawn in stages against works.

How long does ground up development finance take to arrange?

How long ground up development finance takes to arrange depends on how complete the package is, and on the development valuation, the monitoring surveyor's review of the cost plan and contract, warranty registration and the legal work on title and the planning conditions.

Talk it through with an adviser

Get a free quoteWhatsApp us

Let’s talk property finance

Contact us

Call our team
+44 333 231 8206
Opening hours
Monday to Friday, 9am–6pm
Closed Saturday and Sunday

Your enquiry goes to our team, who will get in touch to discuss your next steps.

Fields marked are required.

We use your details to respond to your enquiry and, if you opt in, send updates. See our privacy policy.